Create a Website Account - Manage notification subscriptions, save form progress and more.
Important: Application for site development and new structures will not be accepted without a copy of a current Development Permit for the site, with a 911 address, issued by Denton County Public Works.
Find additional information about Development Permits or contact the Denton County Planning Department and by reviewing the Permit and Plan Review Process (PDF).
There are additional requirements for specific types of permits. Refer to each section below for more information. The Permit Fee Schedule (PDF) will have the fee amount for each listed Construction or Operational Permit.
For the list of required permits see the Construction Permits List (PDF).
The Application for Construction Permit (PDF) is a multi-use form. The information area for the Project Name and Submitting Company Name should be filled out completely. The following areas should be completed only for the set and/or type of plans that are to be submitted for review. Items marked with an asterisk (*) are required areas to be checked:
There is a specific Construction Application for Oil Gas Well Drilling Permit (PDF) with specific requirements related to the industry.
Make separate Application for an Above Ground Storage Tank (Associated product collection and/or Tank Batteries) under an Operational Permit (PDF).
Check List for any required Operational Permits that may apply to your project.
A request for inspection can be called in for scheduling an appointment or a fax can be sent. If faxing in a request please use the Request for Inspections (PDF) form. Please allow 48 hours for a request prior to the date of the inspection. Scheduling of appointments will have to be approved and verified.