Pending Projects

This is a list of projects that are in design or awaiting the selection of a contractor for construction that are managed or overseen by the Department of Transportation and Engineering (DOTE).

Hilltop Road Reconstruction Project (Commissioner Precinct 4)

Stretching from FM 407 North to the Denton City Limits near FM 1830, this 4 mile project will widen to a minimum of 26’, replace culverts to improve drainage, and improve the safety of the road.  Plans are nearly complete and ROW is being addressed.  If you have questions or concerns about this project, then please submit them to Robert White. Construction should start summer of 2021.

Funding from Denton County Precinct 4 (Dianne Edmondson) and Town of Bartonville

99% Design Complete

Plainview Road Reconstruction (Commissioner Precinct 4)

From the Krum city limits to FM 1173 this project just started design. Current design considerations are widening to 24’, consider cost saving measures for internal crews (or major maintenance), and improve drainage.   Design is expected to be complete by Spring of 2022.

Funding from Denton County Precinct 4 (Dianne Edmondson)

0% Design Complete

 Seaborn Road Bridge Replacement (Commissioner Precinct 4)

Near the Ponder Town limits about 1000’ East of SH 156 this project is in design. Currently the County is looking at acquiring easements/ROW for the construction of a new bridge 32’ wide from outside of rail to outside of rail.   Funding for this project is coming from TXDOT and the federal bridge program (BRINSAP).  Construction Letting is expected to be by Spring of 2022 with a likely start summer of 2022.

Funding from TXDOT and FHWA (Amyx Hill Road Culvert Replacement—Denton County Precinct 4 [Dianne Edmondson]—was used as the Equivalent Match Portion [EMP] for the county’s share)

30% Design Complete

Waketon Road Reconstruction Project (Commissioner Precinct 4)

Value engineering has put this project on hold as some design changes to reduce the impact of utilities are underway.  This road will be reconstructed to accommodate underground drainage, sidewalks, and widen to include left turn lanes and other safety improvements.  Construction should start summer of 2021.

Funding from Denton County Commissioner Precinct 4 (Dianne Edmondson) and Town of Flower Mound

99.9% Design Complete